Lifting Equipment 2 Ton Electric Chain Hoist with Electirc Trolley

Lifting Gear two Ton CZPT Chain CZPT with Electirc Trolley

CZPT Chain CZPT-Introduction:

1.Shell:
Made of light-weight aluminumalloy, the cooling fin is specifically designedto make sure fast heat dissipation with therate up to 40% and steady provider.The integral enclosed composition isapplicable to chemical plant and electroplated manufacturing unit

2.Facet magnetic baking gadget:
atest designof magnetic orce generator, it makes it possible for instantbrake as before long as the power off.

3.Help body:
Consist of two sturdy metal plates

four.Transformer:
24V/36V/48V
Used to prohibit unexected accident,for example, CZPT leakage while raining.

5.Electromagnetic contractor:
Long doing work daily life.

6.Mechanical braker:
Dual braking systemto be saft and reliable.

seven.Chain:
Chinese Chain Or CZPTed FEC80 extremely warmth-treatable alloy aluminum, It can utilized in poor environments this sort of as raining, sea h2o and chemical.

eight.Reverse guarding device:
specific cable solution defend control wire technique.

nine.Hook:
hot forging with best toughness,difficult to break. The reduced hook is ensured by 360 degree rotation with protection tongue piece.

10.Drive button:
Water-proof, lifght and resilient.

CZPT Wire Rope CZPT-Operating Situations:

1.Altitude does not exceed 1000m
two.Ambient air temperature is -twenty ° C ~ +40 ° C
three.Ambient air humidity is not more than eighty five% (at twenty five ° C)
four.Electrical power: three-stage AC, 380V, 50HZ. Motor terminal voltage fluctuation ±10%
five.The electric powered hoist is generally put in indoors. When setting up outside, a rain cover need to be included.
When the over environmental circumstances are not satisfied, special orders are created in accordance to non-normal products.

CZPT Wire Rope CZPT-Principal Construction:

Reducer, operating organizations, roller gear, hook units, couplings, flexible cable existing into the unit and stopper.
Motor is with cone rotor motors, established the electrical power and braking power in one.

CZPT Parameter

Design NCH
.five-01S 01-01S 01-02S 1.5-01S 02-01S 02-02S 2.five-01S 03-01S 03-02S 03-03S 05-02S
Ability(Ton) .5 one 1 1.5 2 2 two.5 three three 3 5
Lifting velocity(m/min) 7.two 6.eight 3.six eight.8 six.six 3.four five.six five.6 three.3 two.two two.8
Motor Energy(kw) one.1 1.five 1.one 3 3 one.5 3 three 3 1.five 3
Web Excess weight(kg) forty seven sixty five fifty three 108 108 73 115 one hundred fifteen 131 85 145
Product NCH
.five-01D 01-01D 01-02D 1.five-01D 02-01D 02-02D 2.five-01D 03-01D 03-02D 03-03D 05-02D
Ability(Ton) .5 one 1 1.5 two two 2.five 3 three 3 five
Lifting pace(m/min) seven.two/two.4 6.9/two.three three.6/1.2 8.8/two.nine six.6/2.two 3.three/1.1 5.6/one.8 five.6/one.8 three.3/1.1 2.2/.8 2.eight/.nine
Motor Electrical power(kw) one.1/.37 1.eight/.6 1.one/.37 3./1. 3./1. 1.8/.six 3./1. three./one. 3./one. 1.8/.six three./one.
Net Excess weight(kg) fifty four seventy five sixty 128 128 83 a hundred thirty five 135 151 95 one hundred sixty five
Other Specification for Solitary and CZPT Velocity CZPT Chain CZPT
Rotation speed(r/min) 1440
Insulation Quality F course
Touring pace(m/min) Gradual: 11m/min & Quick: 21m/min
Electricity Source three-Period 380v 50Hz
Handle Voltage 24V 36V 48V
NO.of Load Chain 1 1 2 1 one 2 1 one 2 3 two
Spec.of load Chain Φ6.three Φ7.1 Φ6.3 Φ10. Φ10. Φ7.one Φ11.two Φ11.2 Φ10. Φ7.1 Φ11.2
I-Beam(mm) 75-125 seventy five-178 seventy five-178 eighty two-178 eighty two-178 eighty two-178 100-178 a hundred-178 100-178 100-178 112-178

Drawing

Lifting Equipment 2 Ton Electric Chain Hoist with Electirc Trolley